Right Tumble Down Link 3

righttumbledownlink3.jpg

23-July-2006

Using a 5C collet holder on the mill to make the bore in the link concentric with the boss.

Drilling the lifting lever hole. The finished Left Tumble Down Link is on the mill table.

Photo album created with Web Album Generator